Fixed unit for high pressure sewage cleaning CAK 2
The tank, wiring and all technology is housed in an insulated bodywork made of 40 mm PUR panels. The bodywork is equipped with independent heating for year-round operation.
Water tank – air volume approx. 2 000 l:
- plastic /event. Stainless steel/
- filling connection C-coupling accessible from the side of the structure
- with overflow as overfill protection
- filling height indicator
- inspection manhole in upper part of the tank
- easy to clean water filter for filling
High pressure pump:
- working pressure max.150 bar
- pumped amount 61 l/min.
- safety and control valve 0 – MAX
- fine high-volume filter at the inlet to the pump
- glycerin manometer for operating pressure control
- auxiliary gearbox drive
Double hydraulic hose drum:
- hydraulically driven, with stepless speed control in both directions
- with automatic hose guidance
- capacity for
- 80 m pressure hose DN 3/4“
- 50 m pressure hose DN 3/8“
- the winch is hydraulically extendable above the sewer shaft + rotating guide roller
Control panel:
- non-pressure circulation – BYPASS
- glycerin manometer
- HP pump pressure regulation
- optical and acoustic signalization of water level
- independent heating control
- hydraulic winch wind / unwind
- winch speed continuously adjustable
- working light
- socket for portable working light
- high pressure MTH counter
- button TOTAL STOP
Standard accessories:
- LED flash lights in the rear part of the superstructure
- Hook wrench for „C“ coupling
- fasteners for pickaxe and shovel
- working light on the rear superstructure part
- working reflector incl. 15 m cable
- independent heating
- 3/8“ and ¾“ cleaning nozzle
- 3/8“ and ¾“ pointed nozzle with front jet
- high pressure gun with flat and round nozzle
- storage space for tools, nozzles and protective equipment
- filling fire hose „C“ 10 m
Colour design:
- blue superstructure according to RAL
Documents:
- operating and maintenance instructions of the structure
- operating and maintenance instructions of the HP pump
- declaration of conformity
- certified copy of the approval of the fixed superstructure type
Winter measures up – 20 ºC:
- high pressure part fittings and hoses draining
- insulation of all structure parts – machines, tanks, drums
- independent heating located in the rear part of the structure